Shiga · Easy · Circular

Ibuki-yama: the summit paths from the Driveway

A short round on the summit plateau of Ibuki-yama (伊吹山), 1,377 m, from the car park at the end of the Ibukiyama Driveway: up the middle path, down the east path.

Distance
1.8 km (1.1 mi)
Ascent
92 m
Time
About 45 min
High point
1,368 m
Grade
Easy

Alpsdake · CC BY-SA 4.0 · Wikimedia Commons

Line © OpenStreetMap contributors (ODbL), drawn by Global Adventurer.

0 km1 km1,368 m1,256 m
Move along the height chart to see each point on the map.

The walk

From the car park at the top of the toll road take the middle path (中央登山道) straight up to the summit plateau of Ibuki-yama (伊吹山), 1,377 m, where there are huts. Go down the east path (東登山道), which is one-way, downhill only, and longer; it comes back to the car park. The operator's west path (西登山道) is another way up.

The round is 1.8 km with 92 m of ascent; allow about three quarters of an hour. The grade is Easy.

The summit can only be reached this way. Maibara city says the trail from the foot at Ueno was badly broken by rain on 12 July 2023, that the landowner forbids climbing from the Maibara side whatever the season, and that no date is set for repair. The Driveway is for motor vehicles only; its operator gives the toll for a car as 3,400 yen there and back, plans to close it for winter after 23 November 2026 and gives the reopening as the third Saturday of April. The operator's access page says its summit buses ran from 18 July to 31 August 2026, from Maibara station also on weekends and holidays in September, and have ended.

The start is the car park at the top of the Ibukiyama Driveway, at about 1,260 m. The line was drawn by our router along OpenStreetMap paths; it is desk work and has not been walked by us.

Route drawn by Global Adventurer along OpenStreetMap paths (© OpenStreetMap contributors, ODbL), with figures worked out from it. Check the forecast and the ground on the day: paths change.

Good to know

  • Ibuki-yama (伊吹山) is 1,377 m in OpenStreetMap
  • The Driveway's operator gives the west path as 1 km and about 40 minutes to the top, the middle path as 500 m and about 20 minutes, and the east path as 1.5 km and about 60 minutes, downhill only
  • Maibara city says the Driveway is a road for motor vehicles only

Summits on the way

  • 伊吹山 1,377 m · passed close by

Getting there

Start: Ibukiyama Driveway summit car park. 35.42158, 136.40721

Directions to the start

Google Maps Apple Maps

Places to stay nearby

Rooms in and around 近江長岡: Booking.com → Expedia → Hotels.com →

Affiliate links: if you book, Global Adventurer earns a small commission at no cost to you.

Paths change, and the weather decides the day. The line is drawn along OpenStreetMap paths and the figures are worked out from it; take a map, check the forecast, and turn back if it isn't right.