Line © OpenStreetMap contributors (ODbL), drawn by Global Adventurer.
The walk
The walk starts at the Duck Pass Trailhead, at the far end of Coldwater Campground in the Mammoth Lakes Basin. The Duck Pass Trail climbs the forested hillside behind the campground and enters the John Muir Wilderness. It passes above Arrowhead Lake, which a short spur reaches, then runs beside Skelton Lake and on to Barney Lake, under the headwall. Steep, rocky switchbacks climb from Barney Lake to Duck Pass, at about 10,800 feet, where Duck Lake comes into view just below on the far side. Return the same way.
It is 7.5 miles (12.0 km) round trip with 1,650 feet (502 m) of climbing; allow about 4½ hours. The grade is Moderate: a steady climb on a good trail, steep and rocky for the last mile, and high all the way.
No permit is needed for a day hike. The trailhead is at about 9,100 feet, so take the climb slowly. This is an active bear area: use the bear-proof lockers and leave no food in the car. Campfires are not allowed in Coldwater Canyon.
Lake Mary Road is closed above Tamarack Lodge after the first major snowstorm of the season, and for the rest of the winter the Lakes Basin can be reached only on snowshoes and skis. Coldwater Campground closes earlier in the fall; if its gate is shut, check locally that the trailhead can still be reached.
Route drawn by Global Adventurer along OpenStreetMap paths (© OpenStreetMap contributors, ODbL), with figures worked out from it. Check the forecast and the ground on the day: paths change.
Good to know
- Past Arrowhead, Skelton and Barney Lakes, with Duck Lake just over the pass
- Starts in the Mammoth Lakes Basin, a short drive above the town
- The climb from Barney Lake to the pass is on steep, rocky switchbacks
Getting there
Start: Duck Pass Trailhead. 37.59149, -118.98948
Directions to the start
Places to stay nearby
Rooms in and around Eastern Sierra: Booking.com → Expedia → Hotels.com →
Affiliate links: if you book, Global Adventurer earns a small commission at no cost to you.
Paths change, and the weather decides the day. The line is drawn along OpenStreetMap paths and the figures are worked out from it; take a map, check the forecast, and turn back if it isn't right.