The line is OpenStreetMap's mapping of the route (© OpenStreetMap contributors, ODbL), via Waymarked Trails, with heights from a 30 m terrain model. Check the current official route before a long trip: diversions and permitted paths change. See the source.
The route
New Zealand's longest Great Ride runs about 300 km from the foot of Aoraki/Mount Cook to the Pacific at Oamaru, dropping from the Southern Alps through the Mackenzie and Waitaki country: along turquoise Lake Pukaki to Twizel, by Lake Ohau and over the trail's high point to Omarama, past the Waitaki hydro lakes to Kurow and Duntroon, and down to the coast. The first section needs a short helicopter hop across the Tasman River (Lake Tekapo is the alternative start), and most people ride it in four to six days.
Stages
A suggested split into 5 days of about 38 mi (61 km). Each day ends at the town or village on the way nearest to an equal share of the distance, or at a hotel or hostel where there is none. These are not the official stages: check where you can stay before you book.
-
Day 1
Aoraki/Mount Cook to Twizel 49 mi · 49 mi from the start
-
Day 2
Twizel to Lake Ohau Alpine Village 20 mi · 68 mi from the start
-
Day 3
Lake Ohau Alpine Village to open country (no village near) 45 mi · 113 mi from the start
-
Day 4
Open country to Duntroon 45 mi · 158 mi from the start
-
Day 5
Duntroon to Oamaru 33 mi · 191 mi from the start
Start and finish
Start: near Aoraki/Mount Cook, Mackenzie District. -43.71901, 170.09432
Finish: near Oamaru, Waitaki District. -45.09970, 170.96824
Places to stay
Rooms in the towns and villages along the way:
- Aoraki/Mount Cook, Mackenzie District · The start Booking.com → Expedia → Hotels.com →
- Twizel, Mackenzie District · After day 1 Booking.com → Expedia → Hotels.com → Hostelworld →
- Lake Ohau Alpine Village, Waitaki District · After day 2 No rooms mapped nearby: a hut or camping
- Duntroon, Waitaki District · After day 4 Booking.com → Expedia → Hotels.com → Hostelworld →
- Oamaru, Waitaki District · The finish Booking.com → Expedia → Hotels.com → Hostelworld →
Affiliate links: if you book, Global Adventurer earns a small commission at no cost to you.
Questions about the Alps 2 Ocean Cycle Trail
How long is the Alps 2 Ocean Cycle Trail?
Alps 2 Ocean Cycle Trail is 191 mi long, with 10,125 ft (3,086 m) of ascent and a high point of 2,982 ft (909 m).
How many days does the Alps 2 Ocean Cycle Trail take?
Our plan uses 5 days of about 38 mi (61 km) each, ending at the towns and villages with rooms. These are not official stages, so check where you can stay before you book; you can walk it faster or slower.
Where does the Alps 2 Ocean Cycle Trail start and finish?
It starts near Aoraki/Mount Cook, Mackenzie District and finishes near Oamaru, Waitaki District. The page gives directions to the start.
Where can I stay on the Alps 2 Ocean Cycle Trail?
The page suggests Aoraki/Mount Cook, Twizel, Lake Ohau Alpine Village, Duntroon, Oamaru, with booking links for your dates under Places to stay. Many villages are a short walk off the line, so allow for that at either end of the day.
Can I follow the Alps 2 Ocean Cycle Trail for free in the app?
Yes. Every long-distance route in the app is free to follow.
Roads and paths change, and surfaces vary with the weather. The line comes from the source named under the map and the heights from a terrain model, so treat the figures as a guide. Check for diversions before you go, ride to what you find, and give way to walkers and horses.