Map
The map is fetched only when you ask for it. Map data © OpenStreetMap contributors.
Ground
By length, as mapped: minor roads (81%), paths (12%), tracks (6%), secondary roads (1%).
On tertiary, secondary and main roads, as mapped: 1%.
Surface, as mapped: 29% paved, 59% unpaved, 12% not mapped.
This is what the mapped ways' own tags say, and tags can be out of date. It is not a description of the ground on the day.
Route details
- Operator
- HeideRegion Uelzen e.V.
- Reference
- BO4
- Network
- Local
Start
The start of the mapped line: 52.89236, 10.65168
Directions to the start
Nearest named places, as mapped: Wieren, Bad Bodenteich, Häcklingen.
Nearest railway station to the start, as mapped: Wieren (270 m away).
Nearest railway station to the end, as mapped: Bad Bodenteich (650 m away).
7 car park(s) mapped as open to the public within 400 m of the start. A count only: the map says nothing here about space or charges.
Where this comes from
Line and name © OpenStreetMap contributors (ODbL), as mapped at 24 November 2026. Figures worked out by Global Adventurer from the line. We have not written this route up: it has no description, photograph or start advice. Paths change and the weather decides the day.