Map
The map is fetched only when you ask for it. Map data © OpenStreetMap contributors.
Ground
By length, as mapped: tracks (68%), cycle paths (16%), minor roads (16%).
Surface, as mapped: 32% paved, 68% unpaved.
This is what the mapped ways' own tags say, and tags can be out of date. It is not a description of the ground on the day.
Route details
- Operator
- Regionalverband Ruhr
- Reference
- 18-19
- Network
- Regional
- From
- Lünen-Beckinghausen
- To
- Halde Großes Holz
Start
The start of the mapped line: 51.61216, 7.55621
Directions to the start
Nearest named places, as mapped: Beckinghausen, Heil, Oberaden.
Nearest railway station to the start, as mapped: Lünen Hbf (1,930 m away).
Where this comes from
Line and name © OpenStreetMap contributors (ODbL), as mapped at 24 November 2026. Figures worked out by Global Adventurer from the line. We have not written this route up: it has no description, photograph or start advice. Paths change and the weather decides the day.